【IPH Method Case Study Civil Engineering】Emergency Disaster Prevention and Erosion Control Work on Class I River Nio River
This is an introduction to the IPH method (Internal Pressure Filling Joint Reinforcement Method). Emergency disaster prevention and sediment control work on the first-class river Nio River.
This is an introduction to the IPH method (Internal Pressure Filling Joint Reinforcement Method) in civil engineering. 【Project Name】 Emergency Disaster Prevention Erosion Control Work on the First-Class River Nio River 【Construction Period】 December 22, 2015 – March 18, 2016 【Project Overview】 Erosion Control Dam 【Project Purpose】 Integration of Structures *For more details, please refer to the PDF document or feel free to contact us.
- Company:中日建設株式会社/一般社団法人 IPH工法協会
- Price:Other